The advantages of the new shear wall formwork reinforcement system:

Construction technology

1. Light weight: reduce the operating cost of tower crane and reduce construction accidents;

2. Small error: large format, less splicing and high installation accuracy;

3. Convenient assembly: The new shear wall formwork reinforcement system is easy to assemble, and manual assembly

4. Easy management: the new type of steel support bar is relatively small, the operation space is large, and the on-site management is convenient;

5. Safer: The new type of shear wall formwork reinforcement system has high load load, and its anti-collapse and anti-overturning performance is greatly improved;

6. Less hidden dangers: The new type of shear wall formwork support system adopts carbon steel forging as a whole, which will not catch fire and reduce hidden dangers and material loss.

7. Short construction period: the new type shear wall formwork reinforcement system is cast in one piece, which shortens the construction period and ensures the overall strength and service life of the building.

Green and environmental protection

1. Recycling

The normal service life of the new type shear wall formwork reinforcement system can reach more than 300 times, the maintenance cycle can reach more than 500 times, and the salvage recovery rate is high.

2. Energy saving and emission reduction

Steel frame production does not require wood, and is processed by the factory. One is to reduce the generation of construction waste and reduce construction dust, and the other is to facilitate civilized construction on the construction site and clean the construction site.

3. Cost saving

Although the one-time investment of the new shear wall formwork reinforcement system is more than the traditional system, but it can use more than 300 times the turnover, at the same time can save labor costs, comprehensive, its total cost will not be higher than the wooden formwork, cost-effective.

Since the new shear wall formwork reinforcement system has been applied to the project, both the construction efficiency and the construction cost have been greatly improved. It is forged from high-quality cold-rolled steel, and the weight is easy to move the worker, reducing the worker’s The workload has effectively increased the enthusiasm of the workers.

Our company has been certified as a manufacturer.Visit alibaba stores for more details:https://squarecircleformwork.en.alibaba.com

Manufacturer certification